Pumped Storage Relining

“TO COAT & PROTECT” GENERAL CONTRACTOR USES POLYUREA COATING FOR RESERVOIR RELINING PROJECT Originally published in:       Click here to download a PDF version of this article (as seen in Modern Contractor Solutions) Many hydropower pumped storage facilities are decades old, requiring rehab to enhance life, capacity, efficiency, and resolve groundwater leaking in (infiltration) or out…

Polyurea Joint Fillers Used at US Naval Academy

VersaFlex Polyurea Joint Fillers Used at US Naval Academy

https://vimeo.com/108373771 The VersaFlex polyurea joint sealants and polished concrete installation at new US Naval Academy Commissary in Annapolis, Maryland was a challenging project due to tight time constraints and weather conditions. The polished concrete installation was 32,000 square feet, received a sand aggregate cut, dye and polished to an 800 grit resin. Maryland was experiencing…